Dual XS10 Service Manual Page 25

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 24
71
5 Operation
5.2.2 Dispense channel configuration
The key for Channel A is quoted only as an example. Push the key of the channel for which you
have to make the adjustments.
First press key 4 Channel A, then key 7 Setup.
For adjustments in menu option Advancing Slide,
proceed as described in section 5.4
For adjustments in menu option Rotospray,
proceed as described in section 5.4
For adjustments in menu option Flow monitor,
proceed as described in sections 5.4 and 5.7.
For adjustments in menu option DC motor,
proceed as described in sections 5.4 and 5.6.
For adjustments in menu option Continuous mode (externally actuated dispense time),
proceed as described in section 5.4
For adjustments in menu option Common start,
proceed as described in section 5.4
5.2.3 Setup mode
First press key 4 Channel A, then key 7 Manual mode,
for further procedure see section 5.5.
5.2.4 Timing setup
First press key 4 Channel A, then key 9 Time.
Set the dispense time,
Set predelay and postdelay times only if you require them,
e. g. when operating an advancing slide or a rotor unit.
Percentage speed of a connected DC motor,
for further procedure see section 5.6
5.2.5 Further adjustments
Adjust dispense pressure for connected product reservoir.
The amount of product dispensed is determined by several factors including the following:
– Amount of pressure in the reservoir
– Length of time the dispensing valve remains open.
Required information is described in section 5.8.
5.2.6 Checking of setup
First press key 4 Channel A, or key 5 Channel B, then key 13 Start to start a dispense cycle.
Caution!
If a reservoir pressure has been set for the product supply unit, product will flow from the
connected dispense valves!
Furthermore, the advancing slides connected to the system will move to dispensing position.
Be sure to take appropriate safeguarding action!
Actuate a connected foot switch to trigger a dispense cycle start and check if adjustments are
correct.
If a primary controller (PLC) is connected, trigger a dispense cycle start to check setup and
signal exchange.
Page view 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 47 48

Comments to this Manuals

No comments